Learning targets

22.1 • Change and asset management

Document purpose, scope, systems, dependencies, risk, affected users, approval, window, owner, verification, and rollback. A change advisory board may review risk and timing. Record acceptance from the owner after functional verification. Inventory tracks asset identifier, owner, location, warranty, licensing, and disposal status. Record changes as they happen so support can trust the inventory.

Control the rollout

The pilot fails a required acceptance check during an approved change window.

Try either action to see its effect.

Study tip. Put stop and rollback criteria in the change record before starting.

22.2 • Electrical, environmental, and ESD safety

Disconnect equipment as instructed before servicing and follow workplace electrical procedures. Never open a power supply; refer it to authorized service. Use approved grounded ESD protection for components and keep cables out of walkways. A UPS supplies temporary power during outages; a surge protector limits transient spikes. Follow the safety data sheet and local handling procedures for batteries, toner, and other materials.

Choose outage protection

A lab desktop needs time to save open work and shut down after a power failure.

Try either action to see its effect.

Study tip. Match the protection to the observed risk. Verify the approved shutdown procedure.

22.3 • Scripting basics and validation

A script can read inventory, check disk-space thresholds, or gather status consistently. Identify the supported runtime and extension, such as PowerShell .ps1, batch .bat, shell .sh, Python .py, or JavaScript .js. Variables hold data, conditionals choose an action, and loops repeat checks. Validate inputs, review downloaded code before use, test read-only behavior on a small sample, log failures, and avoid embedding credentials.

Validate an inventory rule

The rule flags measured space below 20 GB. One host is offline and another reports exactly 20 GB.

Try either action to see its effect.

Study tip. Include normal, boundary, invalid, and unreachable fixtures before a pilot.

Predict a script report

With a threshold of less than 20 GB, inputs of 8 GB, 20 GB, 45 GB, no response, and invalid data should produce low, within threshold, within threshold, unreachable, and invalid reading. Use these fixtures before a pilot. The 20 GB row catches a boundary error and the last two rows verify that missing values cannot be mistaken for measured disk space.

Technician case file

A proposed script inventories free space on 35 lab machines before an upgrade. One machine is offline and another returns no valid measurement.

Compare your ticket with the model response

Document approval and pilot scope. Run with the lowest required permissions, record no-response and invalid readings distinctly from low disk space, compare a sample to manual checks, and expand only after review. Define how to stop the rollout and who accepts the report.

Check that your ticket uses the scenario’s clues, explains the action in order, and specifies what a passing verification looks like.

Check your decision

Acceptance-test an inventory script

The approved rule flags a host only when measured free space is below 20 GB. Preserve different outcomes for an unreachable host and an invalid measurement.

Make each decision here, then select Check lab for feedback.

Run a local test with sample records

Set a threshold and compare PC-A through PC-D. Try 20 GB, then change the threshold to 21 GB and explain the difference for PC-B.

Run the pilot to see results.

Review this decision

Nineteen is below the threshold.

Review this decision

The rule says below 20 GB. Equality does not trigger it.

Review this decision

No response is a reachability result and should be retried separately.

Review this decision

A response occurred, but it cannot be interpreted as a space measurement.

Practice and readiness check

Choose the best answer for each question. Explain which clue supports your choice. The final question continues the technician case.

A pilot test fails acceptance during an approved change window. What should the technician do?
Explanation

Predefined rollback prevents a failing pilot from becoming a wider outage.

Which device keeps a workstation running long enough for an orderly shutdown during an outage?
Explanation

Battery runtime from a UPS provides time to save work and shut down.

How should you first validate a new script that reports low disk space across managed PCs?
Explanation

A bounded test verifies expected thresholds and error handling before deployment.

Your pilot reports an offline host as zero free space. How should the report change?
Explanation

Missing evidence requires an explicit status, so the operator can retry instead of treating it as a measurement.

Review objectives 4.2 change management, 4.4 safety, 4.5 environmental controls, 4.8 scripting. Retry missed questions and revise your ticket before updating your Core 2 readiness objectives.